top of page
GTS FIRE TOWER
The Fire Tower project at the Greenlief Training Site consists of a 2,900 square-foot fire training structure which also has the capacity to complete MOUT training, rappelling, and helicopter lift training.
POWER in DATA
Size:
2,900 SF
Schedule:
Six months
Delivery Type:
Design-Bid-Build
GALLERY
![]() | ![]() | ![]() | ![]() |
---|---|---|---|
![]() | ![]() |
bottom of page